Description Constructed at Pokemouche, New Brunswick in 2015-2016 on route 113.
Project Details: Six-span slab-on-girder bridge supported on five piers and two abutments with at total length of 130 m. The bridge was rehabilitated and new 197-mm retrofired slab supported on five AASHTO Type III girders spaced at 1829 mm were constructed. The retrofitted slab and the overhang cantilevers were reinforced with Grade III (60 GPa) TUF-BAR, #5 (15M).
Owner: Ministry of Transportation, NB
Engineers: VALRON Engineers TUF-BAR Product Used: Fiberglass Rebar, 60 GPa (Grade III) Deck: # 5 (15M). A total of 21065 m.